Open Access Same-Time Information System
Encyclopedia
The Open Access Same-Time Information System (OASIS), is an Internet
Internet
The Internet is a global system of interconnected computer networks that use the standard Internet protocol suite to serve billions of users worldwide...

-based system for obtaining services related to electric power transmission
Electric power transmission
Electric-power transmission is the bulk transfer of electrical energy, from generating power plants to Electrical substations located near demand centers...

 in North America
North America
North America is a continent wholly within the Northern Hemisphere and almost wholly within the Western Hemisphere. It is also considered a northern subcontinent of the Americas...

. It is the primary means by which high-voltage transmission lines are reserved for moving wholesale quantities of electricity. The OASIS concept was originally conceived with the Energy Policy Act of 1992
Energy Policy Act of 1992
The Energy Policy Act is a United States government act.It was passed by Congress and addressed energy efficiency, energy conservation and energy management , natural gas imports and exports , alternative fuels and requiring certain fleets to acquire alternative fuel vehicles, which are capable of...

, and formalized in 1996 through Federal Energy Regulatory Commission (FERC)
Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission is the United States federal agency with jurisdiction over interstate electricity sales, wholesale electric rates, hydroelectric licensing, natural gas pricing, and oil pipeline rates...

 Orders 888 and 889.

Before OASIS

Electric utility
Electric utility
An electric utility is a company that engages in the generation, transmission, and distribution of electricity for sale generally in a regulated market. The electrical utility industry is a major provider of energy in most countries. It is indispensable to factories, commercial establishments,...

 systems in North America developed over time as regulated monopolies
Monopoly
A monopoly exists when a specific person or enterprise is the only supplier of a particular commodity...

, jurisdictional utilities given rights to own and operate transmission and distribution
Electricity distribution
File:Electricity grid simple- North America.svg|thumb|380px|right|Simplified diagram of AC electricity distribution from generation stations to consumers...

 networks in a given geographical area along with the responsibility to serve all loads in that same area. At first, utility companies generally served their own system load demand by building local power generation
Electrical generator
In electricity generation, an electric generator is a device that converts mechanical energy to electrical energy. A generator forces electric charge to flow through an external electrical circuit. It is analogous to a water pump, which causes water to flow...

 facilities within their systems. Social, economical and ecological influences later led to new arrangements where a utility company might enter into long-term power purchase or sale agreements with neighboring utility companies, or locate new generation facilities outside of their system and enter into long-term agreements for transmission rights to deliver that energy to their own system. In the short-term world of day-to-day operations, utility companies would agree to "preschedule" (day ahead) or "real time" (same day or next hour) energy transactions with adjacent companies to supplement their own generation asset capabilities.

Vertically Integrated Utilities

As utility companies began integrating their operations in more complex ways with their neighbors, they evolved into a vertical organizational structure with three tiers: Generation, Transmission, and Scheduling. On a day-to-day or day-ahead operational level these functions might be performed by three or more people at large utilities, but might be combined into a single employee's job at a small utility. The size of the back office support for each function varies greatly depending upon the size of the utility.

Generation

The generation group manages the maintenance and operations of generation assets, with an eye on the future regarding when, where and how much generation assets will need to be developed to keep up with future demand.

Transmission

The transmission group concerns itself with maintaining the high voltage transmission system and lower voltage distribution system. As load demands increase or new generation assets come online in their systems, they upgrade existing facilities or construct new transmission corridors to maintain the reliable delivery of energy.

Scheduling

The scheduling group is responsible for ensuring that there is adequate power supply to meet the demand of the customer load on a day-to-day and hour-to-hour basis, and also for procuring resources to meet long term needs. These resources can be procured through the generation group, or through purchases and sales with other companies.

Internal Customers

Unlike a typical residential or commercial/industrial customer, large bulk users of electricity such as mills, mines and large factories generally have the opportunity to negotiate the rates they will pay their supplier for electricity. In some cases they might even have their own generation assets as well. If they chose to use their supplier's generation instead of their own, they might also be required to pay a fee for the transmission to deliver it, since that transmission might be built specifically to serve their needs. Fees for services provided by the transmission group were defined in a pro forma tariff, a document the transmission group supplied that detailed requirements and responsibilities for the purchaser and provider, and definitions and costs of the types of transmission services available.

Impact of the Energy Policy Act of 1992

The Energy Policy Act of 1992
Energy Policy Act of 1992
The Energy Policy Act is a United States government act.It was passed by Congress and addressed energy efficiency, energy conservation and energy management , natural gas imports and exports , alternative fuels and requiring certain fleets to acquire alternative fuel vehicles, which are capable of...

 (EPAct) laid the initial foundation for the eventual deregulation
Deregulation
Deregulation is the removal or simplification of government rules and regulations that constrain the operation of market forces.Deregulation is the removal or simplification of government rules and regulations that constrain the operation of market forces.Deregulation is the removal or...

 of the North American electricity market. This Act called for utility companies to allow external entities fair access to the electric transmission systems in North America. The act's intent was to allow large customers (and in theory, every customer) to choose their electricity supplier and subsequently pay for the transmission to deliver it from the generation to serve their load.

Based on the premise that new generating facilities would be allowed fair access to their regional transmission system, and precipitated by the EPAct of 1992, construction of new independently-owned generation assets began in response to the development of the North American electricity market
Electricity market
In economic terms, electricity is a commodity capable of being bought, sold and traded. An electricity market is a system for effecting purchases, through bids to buy; sales, through offers to sell; and short-term trades, generally in the form of financial or obligation swaps. Bids and offers use...

. Recognizing competition was coming, electric utility companies began modifying their scheduling functions by forming affiliated Power Marketing departments. Similarly, financial trading interests and existing energy companies (outside of electricity) saw the opportunities in the emerging electricity market and began to organize unaffiliated power marketing divisions. With open access, anyone with the proper resources and/or creditworthiness could purchase the rights to generation, move it across the transmission network (provided adequate capacity was available), and deliver it to a place of higher demand.

Following passage of the EPAct of 1992, independent generation owner/operators (also called independent power producers or IPPs) and unaffiliated power marketers lodged frequent complaints with FERC about unfair treatment under the new open access requirements. The complaints generally followed the same theme: vertically integrated electric utility companies would favor their own affiliated power marketing division over external parties trying to move power on the system. In many cases, the power marketers operated side by side with the transmission operators (or it might even be the same person) and there were no rules to prevent unfair treatment of external transmission system users.

FERC Orders 888 and 889

To protect and promote generation competition and also enforce fair treatment of external users of the transmission system, FERC issued Order 888 and Order 889 on April 24, 1996. The EPAct of 1992 was the beginning of electric deregulation in North America, but Orders 888 and 889 marked the point where the trading of electricity gained a firm foothold.

Order 888, the "Standards of Conduct" order

Order 888's primary objective was to establish and promote competition in the generation market, by ensuring fair access and market treatment of transmission customers. FERC outlined six points to accomplish this goal:
  • Require all jurisdictional utilities (within the United States) to file an open-access transmission tariff (OATT)
  • Require investor-owned utilities (IOU’s) to functionally unbundle wholesale generation and power marketing from transmission services
  • Create Independent System Operators (ISO's) and operating guidelines
  • Encourage reciprocity for non-jurisdictional (Canadian and Mexican) utilities
  • Allow utilities to recover stranded costs
  • Identify ancillary services and comparable services to properly operate the bulk power system


One fairly immediate result of this order was the functional separation and isolation of the power schedulers and power marketers within vertically integrated utilities from their company’s area of transmission operations. Affiliated power marketers could no longer work alongside the transmission operators who were charged with treating them and external parties equally, and at the same time affiliated power marketers would no longer have any “inside information” on the availability of the transmission system nor the transactions being scheduled on it.

Order 889, the “Open Access” order

Order 889 went to great lengths to detail exactly how all participants in the electricity market should interact with transmission providers. It laid out the structure and function of what became known as OASIS “nodes,” which are secure, web-based interfaces to each transmission system’s market offerings and transmission availability announcements. Each OASIS node was to be the single point of information dissemination to the market as well as the customer portal for transmission service requests, even for affiliated power marketers wanting access to their own parent company’s transmission.

OASIS Nodes

OASIS nodes are entirely web-based, and public access is limited. Power marketers that become signatories to a transmission provider’s OATT gain more complete access so they can view existing transmission and service availability and existing service requests made by other parties. There are also market observers who have read-only access, who may view activity but not request services.

Transmission facilities have power transfer limits that must be maintained to allow the power grid to operate reliably. Transmission operators perform system studies in various future time frames to determine how much transfer capacity is required to serve their own “native load”, and how much capacity must remain as a buffer to prevent unscheduled or accidental overflows that can damage high voltage equipment. The difference between the capacity needed to serve load and to maintain safe flow margins can be made available for purchase on the OASIS node.

Unplanned outages and other system emergencies can adversely impact the total power transfer capability across transmission systems, and it sometimes becomes necessary for transmission providers to curtail power flows across the system by revoking transmission rights given to buyers on the OASIS. Some transmission buyers are willing to pay higher rates to avoid having their transactions curtailed, and as such transmission companies offer different priorities of transmission service at varying rates. The least expensive type of transmission is generally “non-firm” and purchased on an hour to hour basis. Daily non-firm is a slightly higher priority (because the buyer committed to purchasing all day), and increments go up from there to weekly, monthly, seasonally, yearly, or longer with the cost for each also rising incrementally. “Firm” transmission services are even more expensive, but are the last transactions to be curtailed.

Even before the appearance of the OASIS nodes, many groups of transmission owners had already turned over operational control of their collective bulk transmission systems to Independent System Operators of various forms. These ISO's offered OASIS access to their collective systems very early on, so that it was often possible to make a single OASIS transmission service request that could cross multiple transmission systems. Since the inception of OASIS, and under the prodding of FERC to move transmission assets under the control of ISO's, the number of OASIS nodes is decreasing as ISO's assume control of transmission systems and consolidate their related OASIS functions.

OASIS impacts

After the doors opened to allow power marketers to move their electricity purchases across multiple transmission systems, many transmission operators saw their transmission systems loaded to much higher levels. Even though transmission services are generally obtained “point-to-point”, in actuality power flows divide among numerous paths according to the properties of electricity and thus the actual energy flows follow the path of least resistance
Path of least resistance
The path of least resistance describes the physical or metaphorical pathway that provides the least resistance to forward motion by a given object or entity, among a set of alternative paths. The concept is often used to describe why an object or entity takes a given path.In physics, the path of...

.

A result of the long distance electricity transactions being scheduled was the impact of "loop flows" caused by energy flowing on these alternate paths. Transmission system operator
Transmission system operator
File:Electricity grid simple- North America.svg|thumb|380px|right|Simplified diagram of AC electricity distribution from generation stations to consumersrect 2 243 235 438 Power stationrect 276 317 412 556 Transformer...

s were faced with a dilemma: The problems were often being caused by external influences, and the only way available to them to reduce the stress on the transmission system was to curtail their own transmission sales. This resulted in a loss of revenue and still did not always solve the overloading problems.

The North American Electric Reliability Corporation (NERC) stepped in to address this new problem that threatened the North American power grid by introducing the NERC Tag
NERC Tag
A NERC Tag, also commonly referred to as an E-Tag, represents a transaction on the North American bulk electricity market scheduled to flow within, between or across electric utility company territories...

ging application. NERC Tags captured entire transactions from beginning to end. This let them string together all the transmission legs obtained on various OASIS nodes, and then determine how the total schedule impacted transmission systems, and what priorities of transmission were used in the schedule. This let them determine which schedules should be curtailed to relieve loading on transmission systems.

NERC also assumed control of a database of electric power system data. The Transmission System Information Networks (TSIN) web-based database contains a comprehensive listing of generation points, transmission facilities and delivery points as well as transmission and generation priority definitions with regard to the applications that use it, namely the various OASIS nodes as well as the NERC Tagging application.

See also

  • United States energy
  • ISO/RTO
  • Independent System Operator (ISO)
  • Regional Transmission Organization
    Regional Transmission Organization
    A regional transmission organization in the United States is an organization that is responsible for moving electricity over large interstate areas. Like a transmission system operator , an RTO coordinates, controls and monitors an electricity transmission grid that is larger with much higher...

     (RTO)
  • Transmission system operator
    Transmission system operator
    File:Electricity grid simple- North America.svg|thumb|380px|right|Simplified diagram of AC electricity distribution from generation stations to consumersrect 2 243 235 438 Power stationrect 276 317 412 556 Transformer...

    (TSO)

External links

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK