HMAS Nestor (G02)
Encyclopedia

HMAS Nestor (G02) was an N class destroyer of the Royal Australian Navy
Royal Australian Navy
The Royal Australian Navy is the naval branch of the Australian Defence Force. Following the Federation of Australia in 1901, the ships and resources of the separate colonial navies were integrated into a national force: the Commonwealth Naval Forces...

 (RAN). Built in Scotland, Nestor was commissioned in February 1941; although manned by Australians and commissioned as an Australian warship, she remained the property of the Royal Navy.

Entering service in 1941, Nestor spent most of her career as a patrol and escort vessel in the Atlantic Ocean, the Mediterranean, and the Far East. In December 1941, the destroyer located and sank the German submarine U-127. In June 1942, Nestor sailed as part of the Operation Vigorous
Operation Vigorous
Operation Vigorous was a World War II Allied operation to deliver a supply convoy that sailed from Haifa and Port Said on 12 June 1942 to Malta. The convoy encountered heavy Axis air and sea opposition and returned to Alexandria on 16 June....

 escort force, protecting a supply convoy to Malta. On the evening of 15 June, the ship was heavily damaged by air attack. Despite attempts to tow the ship to base, Nestor was abandoned and scuttled off Crete the next morning. Nestor is the only ship of the RAN that never operated in Australian waters.

Design and construction

The N class destroyer had a displacement
Displacement (ship)
A ship's displacement is its weight at any given time, generally expressed in metric tons or long tons. The term is often used to mean the ship's weight when it is loaded to its maximum capacity. A number of synonymous terms exist for this maximum weight, such as loaded displacement, full load...

 of 1,773 tons at standard load, and 2,550 tons at full load. Nestor was 356 in 6 in (108.66 m) long overall and 229 in 6 in (69.95 m) long between perpendiculars, had a beam of 35 in 8 in (10.87 m), and a maximum draught of 16 in 4 in (4.98 m). Propulsion was provided by Admiralty 3-drum boilers connected to Parsons geared steam turbines, which provided 40,000 shaft horsepower to the ship's two propellers. Nestor was capable of reaching 36 knots (19.6 m/s). The ship's company consisted of 249 officers and sailors at the time she was sunk.

The ship's armament consisted of six 4.7-inch QF Mark XII guns
4.7 inch QF Mark XII
The 4.7 inch QF Mark IX and Mark XII were 120-mm 45-calibre naval guns which armed the majority of Royal Navy and Commonwealth destroyers in World War II, and were exported to many countries after World War II as the destroyers they were mounted on were sold off.-Description and history:These guns...

 in three twin mounts, a single 4-inch QF Mark V gun
QF 4 inch Mk V naval gun
The QF 4 inch Mk V gun was a Royal Navy gun of World War I which was adapted on HA mountings to the heavy anti-aircraft role both at sea and on land, and was also used as a coast defence gun.-Naval service:...

, a 2-pounder 4-barrel Pom Pom
QF 2 pounder naval gun
The 2-pounder gun, officially designated the QF 2-pounder and universally known as the pom-pom, was a 1.575 inch British autocannon, used famously as an anti-aircraft gun by the Royal Navy. The name came from the sound that the original models make when firing...

, four 0.5-inch machine guns, four 20 mm Oerlikon anti-aircraft guns, four .303 Lewis machine guns
Lewis Gun
The Lewis Gun is a World War I–era light machine gun of American design that was perfected and widely used by the British Empire. It was first used in combat in World War I, and continued in service with a number of armed forces through to the end of the Korean War...

, two Pentad torpedo launcher tube sets (with 10 torpedoes carried), two depth-charge throwers and one depth-charge chute (with 45 charges carried). The 4-inch gun was removed later in Nestors career.

Nestor was laid down by the Fairfield Shipbuilding and Engineering Company, Limited, at Govan
Govan
Govan is a district and former burgh now part of southwest City of Glasgow, Scotland. It is situated west of Glasgow city centre, on the south bank of the River Clyde, opposite the mouth of the River Kelvin and the district of Partick....

, Scotland on 26 July 1939. She was launched on 9 July 1940 by the daughter of one of the shipyard directors. Nestor was commissioned into the RAN on 3 February 1941; although manned and commissioned as an Australian warship, the destroyer remained the property of the Royal Navy. The destroyer's name came from the mythological ruler
Nestor (mythology)
In Greek mythology, Nestor of Gerenia was the son of Neleus and Chloris and the King of Pylos. He became king after Heracles killed Neleus and all of Nestor's siblings...

. The ship cost 398,960 pounds to build.

Operational history

During sea trials, Nestor was called on to make several deployments north of the British Isles, in poor conditions. On 14 May, the sailors aboard mutinied in response to the heavy drinking sessions of the ship's captain and two other senior officers: they locked themselves in their accommodations and refused to man the ship until the officers were removed. The ship's doctor visited the admiral at Scapa Flow
Scapa Flow
right|thumb|Scapa Flow viewed from its eastern endScapa Flow is a body of water in the Orkney Islands, Scotland, United Kingdom, sheltered by the islands of Mainland, Graemsay, Burray, South Ronaldsay and Hoy. It is about...

 (where the ship was based); the admiral sent marines
Royal Marines
The Corps of Her Majesty's Royal Marines, commonly just referred to as the Royal Marines , are the marine corps and amphibious infantry of the United Kingdom and, along with the Royal Navy and Royal Fleet Auxiliary, form the Naval Service...

 to arrest the three officers, and appointed a new commander to Nestor.

After completing sea trial
Sea trial
A sea trial is the testing phase of a watercraft . It is also referred to as a "shakedown cruise" by many naval personnel. It is usually the last phase of construction and takes place on open water, and can last from a few hours to many days.Sea trials are conducted to measure a vessel’s...

s, Nestor was assigned to escort and patrol duties in the North Atlantic. During May, she was involved in the pursuit of the German battleship German battleship Bismarck
German battleship Bismarck
Bismarck was the first of two s built for the German Kriegsmarine during World War II. Named after Chancellor Otto von Bismarck, the primary force behind the German unification in 1871, the ship was laid down at the Blohm & Voss shipyard in Hamburg in July 1936 and launched nearly three years later...

, but had diverted to Iceland for fuel when the Allied force encountered and sank the German ship. Nestor was transferred to the Mediterranean in July, and was involved in the Malta Convoys
Malta Convoys
The Malta Convoys were a series of Allied supply convoys that sustained the besieged island of Malta during the Mediterranean Theatre of the Second World War...

, then performed escort duties in the South Atlantic before returning to England for refit in October. The destroyer returned to service as a Malta Convoy escort in December. On 15 December, Nestor encountered the German submarine U-127 off Cape St. Vincent
Cape St. Vincent
Cape St. Vincent , next to the Sagres Point, on the so-called Costa Vicentina , is a headland in the municipality of Sagres, in the Algarve, southern Portugal.- Description :This cape is the southwesternmost point in Portugal...

; the destroyer successfully hunted down and destroyed the submarine with depth charges.

In January 1942, Nestor was reassigned to the Far East. During the voyage, Nestor and several sister ships escorted the aircraft carrier during attempts to deliver aircraft to Malaya. After this, Nestor joined the British Eastern Fleet
British Eastern Fleet
The British Eastern Fleet was a fleet of the Royal Navy which existed from 1941 to 1971...

, and was based at Colombo. In March 1942, the town of Andover, Hampshire
Andover, Hampshire
Andover is a town in the English county of Hampshire. The town is on the River Anton some 18.5 miles west of the town of Basingstoke, 18.5 miles north-west of the city of Winchester and 25 miles north of the city of Southampton...

 adopted Nestor after they raised £214,467 during a Warship Week
Warship Week
Warship Weeks were British National savings campaigns during the Second World War, with the adoption of a Royal Navy warship by a civil community. A level of savings would be set to raise enough money to provide the cost of building a particular naval ship...

. A plaque commemorating this short-lived association can be seen in the Andover Museum. In May 1942, the destroyer was assigned back to the Mediterranean.

Loss

On 12 June 1942, Nestor sailed from Haifa
Haifa
Haifa is the largest city in northern Israel, and the third-largest city in the country, with a population of over 268,000. Another 300,000 people live in towns directly adjacent to the city including the cities of the Krayot, as well as, Tirat Carmel, Daliyat al-Karmel and Nesher...

 as part of the large escort force for Operation Vigorous
Operation Vigorous
Operation Vigorous was a World War II Allied operation to deliver a supply convoy that sailed from Haifa and Port Said on 12 June 1942 to Malta. The convoy encountered heavy Axis air and sea opposition and returned to Alexandria on 16 June....

; a Malta Convoy consisting of 11 merchant ships carrying food, fuel, and supplies for the besieged island. Air harassment of the convoy began almost immediately after leaving port. During the afternoon of 15 June, the convoy received word that a second convoy (Operation Harpoon
Operation Harpoon (1942)
Not to be confused with Operation Harpoon Operation Harpoon was one of two simultaneous Allied convoys sent to supply Malta in the Axis-dominated Mediterranean Sea in mid-June 1942, during the Second World War. One convoy, Operation Vigorous, left Alexandria. The other, Operation Harpoon, travelled...

) sailing from the west had successfully arrived, and based on the quantity of air attacks and intelligence that an Italian fleet was in the area, it was decided to return the Vigorous convoy to Alexandria.

At around 18:00, while off Crete
Crete
Crete is the largest and most populous of the Greek islands, the fifth largest island in the Mediterranean Sea, and one of the thirteen administrative regions of Greece. It forms a significant part of the economy and cultural heritage of Greece while retaining its own local cultural traits...

, an Italian bomber successfully attacked Nestor, killing four sailors and seriously damaging the destroyer's engine rooms. began to tow Nestor, but by 05:30 on 16 June, the quantity of water taken on by the Australian ship meant that recovery was no longer practical. The ship's company transferred to Javelin, and Nestor was scuttled
Scuttling
Scuttling is the act of deliberately sinking a ship by allowing water to flow into the hull.This can be achieved in several ways—valves or hatches can be opened to the sea, or holes may be ripped into the hull with brute force or with explosives...

 with depth charges. Nestor was the only major RAN ship to never visit Australia.

Nestors wartime service was recognised with four battle honours: "Bismarck 1941", "Atlantic 1941", "Malta Convoys 1941–42", and "Indian Ocean 1942". The ship's bell was recovered, and is on display at the museum at .
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK