Dul Hasti
Encyclopedia
Dulhasti is an 390MW hydroelectric power plant
Hydroelectricity
Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. It is the most widely used form of renewable energy...

 in Kishtwar
Kishtwar
Kishtwar is a town and a notified area committee in Kishtwar District in Jammu and Kashmir, the northernmost state of India.-Geography:Kishtwar is located at...

 district of Jammu and Kashmir
Jammu and Kashmir
Jammu and Kashmir is the northernmost state of India. It is situated mostly in the Himalayan mountains. Jammu and Kashmir shares a border with the states of Himachal Pradesh and Punjab to the south and internationally with the People's Republic of China to the north and east and the...

, India
India
India , officially the Republic of India , is a country in South Asia. It is the seventh-largest country by geographical area, the second-most populous country with over 1.2 billion people, and the most populous democracy in the world...

 built by NHPC. The power plant is built on the swift-flowing Chenab River
Chenab River
The Chenab River چنRiver' آب) is a major river of Jammu and Kashmir and the Punjab in Pakistan. It forms in the upper Himalayas in the Lahaul and Spiti district of Himachal Pradesh, India, and flows through the Jammu region of Jammu and Kashmir into the plains of the Punjab, Pakistan...

 in the Doda region
Doda District
Area11,691 km²Population525,000 Population density36/km2 Literacy18.5% Doda is a district of Jammu region in the state of Jammu and Kashmir, India...

, a rugged, mountainous section of the Himalayas, and several hundred kilometers from larger cities. The project provides peaking power to the Northern Grid with beneficiary states being Jammu and Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarkhand, Rajasthan, Delhi and Union Territory of Chandigarh.

Background

Begun in 1985, the Dulhasti Power project, set in the northern Indian provinces of Jammu
Jammu
Jammu , also known as Duggar, is one of the three administrative divisions within Jammu and Kashmir, the northernmost state in India.Jammu city is the largest city in Jammu and the winter capital of Jammu and Kashmir...

 and Kashmir
Kashmir
Kashmir is the northwestern region of the Indian subcontinent. Until the mid-19th century, the term Kashmir geographically denoted only the valley between the Great Himalayas and the Pir Panjal mountain range...

, represents an example of a disaster in project cost estimation and delivery. As initially conceived, the project's cost was estimated at 1.6 billion rupees (about $50 million). By the time the contract was let, the cost estimate had risen to 4.5 billion rupees and later successively to 8, 11, 16, and 24 billion rupees (nearly $750 million). As of 2004, the project has still not been completed, although well over $1 billion has been spent pursuing it.
The project sought to build a dam, erect a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plains south of the mountain region.

Contracting and Design

The contract for the power generation project was first awarded to a French consortium at a price of $50 million, who almost immediately asked for an upward price revision.
The site was intended to capitalize on the proximity to a large river systems capable of providing the water capacity needed to run a hydroelectric plant of Dulhasti's dimensions. Unfortunately, the site selected for the project came with some serious drawbacks as well. First, it was sited in the disputed border region between Pakistan and India. Jammu and Kashmir have been the epicenter of numerous and serious clashes between separatist forces supported by the Pakistan government and Indian army units stationed in the region to keep peace. Constructing such an obvious target as a power plant in the disputed area was sure to provoke reaction by nationalist groups, using terrorism as their chief means of opposition. Thus, the additional costs of providing security to the site quickly became prohibitively expensive. A second problem concerns the sheer geographical challenge of creating a large plant in a region almost totally devoid of supporting infrastructure, including an adequate logistics network (roads and rail lines). Building the plant in the foothills of the Himalayas may be scenic, but it is not cost effective, particularly as almost all supplies had to be brought in with air transportation, at exorbitant costs. All raw materials, including cement, wood, stone, and steel, had to be hauled by helicopter for miles over snowbound areas.

Current Status

The project became operational on 7th April 2007 and has been generating 1907 Million Units of electricity in a 90% Dependable year


Sources

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK