The Dharasu Power Station is a run-of-the-river hydroelectric power station on the Bhagirathi River
Bhagirathi River
The Bhāgīrathī is a turbulent Himalayan river in the state of Uttarakhand, India, that is the source stream of the Ganges—the major river of the Gangetic plain of Northern India and the holy river of Hinduism.-Etymology:...

 located at Dharasu
Dharasu
-Geography:It is located at at an elevation of 1339 m above MSL. The Dharasu Power Station is located there, on the Bhagirathi River.-Location:National Highway 108 originates at Dharasu. National Highway 94 passes through the town.-External links:*...

 in Uttarkashi district, Uttarakhand
Uttarakhand
Uttarakhand , formerly Uttaranchal, is a state in the northern part of India. It is often referred to as the Land of Gods due to the many holy Hindu temples and cities found throughout the state, some of which are among Hinduism's most spiritual and auspicious places of pilgrimage and worship...

, India
India
India , officially the Republic of India , is a country in South Asia. It is the seventh-largest country by geographical area, the second-most populous country with over 1.2 billion people, and the most populous democracy in the world...

. The power station was commissioned in 2008 and has a 304 MW capacity.

Background

The power station is stage two of the Maneri Bhali Hydroelectric Project which was planned in the 1960s. In 1979, construction on stage two began. In 1984, the first stage, the 90 MW Tiloth Power Plant located upstream at Uttarkashi
Uttarkashi
Uttarkashi, meaning Kashi of the north, is a holy town in Uttarakhand, India. It is the district headquarter of Uttarkashi district. Uttarkashi is situated on the banks of river Bhagirathi at an altitude of 1352 m above sea level. Uttarkashi is home to a number of ashrams and temples and also to...

 at 30°43′36"N 78°26′44"E was completed. Dharasu, the second stage was halted in 1990 due to funding issues and was not restarted until 2002. The power station was eventually completed and commissioned by 2008.

Design

Water supplied to the power station is first diverted from the Bhagirathi River into a 16 km (10 mi) long tunnel by the 81 m (266 ft) long Bhali (Joshiyara) Dam located upstream near Bhali at 30°43′46"N 78°25′25"E. The difference in elevation between the barrage and the power station affords a design hydraulic head
Hydraulic head
Hydraulic head or piezometric head is a specific measurement of water pressure above a geodetic datum. It is usually measured as a water surface elevation, expressed in units of length, at the entrance of a piezometer...

 of 247.6 m (812 ft) and gross head of 285 m (935 ft). The water powers four 76 MW Francis turbine
Francis turbine
The Francis turbine is a type of water turbine that was developed by James B. Francis in Lowell, Massachusetts. It is an inward-flow reaction turbine that combines radial and axial flow concepts....

-generators before being discharged back into the river. The design discharge of the power station is 142 m3/s.