Burton Wold Wind Farm
Encyclopedia
Burton Wold Wind Farm is a wind farm located near Burton Latimer
Burton Latimer
Burton Latimer is a town in Northamptonshire, England, with a population in 2001 of 6,740. It is just south of the junction of the A6 and A14 in the borough of Kettering. The two-mile A6 bypass opened in October 1991.-History:...

 in the English
England
England is a country that is part of the United Kingdom. It shares land borders with Scotland to the north and Wales to the west; the Irish Sea is to the north west, the Celtic Sea to the south west, with the North Sea to the east and the English Channel to the south separating it from continental...

 county of Northamptonshire
Northamptonshire
Northamptonshire is a landlocked county in the English East Midlands, with a population of 629,676 as at the 2001 census. It has boundaries with the ceremonial counties of Warwickshire to the west, Leicestershire and Rutland to the north, Cambridgeshire to the east, Bedfordshire to the south-east,...

, UK. The Wind Farm
Wind farm
A wind farm is a group of wind turbines in the same location used to produce electric power. A large wind farm may consist of several hundred individual wind turbines, and cover an extended area of hundreds of square miles, but the land between the turbines may be used for agricultural or other...

 was developed by Your Energy Ltd, is owned by Mistral Windfarms and operated by Engineering Renewables Ltd. E.ON UK
E.ON UK
E.ON UK is an energy company in the United Kingdom and a subsidiary of E.ON, the world's largest investor-owned power and gas company. As Powergen, it was listed on the London Stock Exchange and was once a constituent of the FTSE 100 Index but since 1 July 2002 has been owned by E.ON AG of...

 is buying the electricity output of the project under a long term power purchase agreement. The farm is spread over three hectare
Hectare
The hectare is a metric unit of area defined as 10,000 square metres , and primarily used in the measurement of land. In 1795, when the metric system was introduced, the are was defined as being 100 square metres and the hectare was thus 100 ares or 1/100 km2...

s. It has an installed capacity of 20 MW and generate on average around 40,000,000 units (kilowatt hours) of electricity annually.

The project

Burton Wold Wind Farm was the first to be erected in Northamptonshire. Construction work on the site began in December 2005, and the wind farm became operational in May 2006. It comprises 10 turbines with a total nameplate capacity
Nameplate capacity
Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity or maximum effect, refers to the intended technical full–load sustained output of a facility such as a power plant, a chemical plant, fuel plant, metal refinery, mine, and many others.For dispatchable power,...

 of 20 megawatts. These 10 turbines have the ability to produce electricity for an average of 10,000 homes each year, the equivalent of 25% of all the homes in the borough of Kettering
Kettering
Kettering is a market town in the Borough of Kettering, Northamptonshire, England. It is situated about from London. Kettering is mainly situated on the west side of the River Ise, a tributary of the River Nene which meets at Wellingborough...

. The E70-E4 turbines were supplied by Enercon Gmbh
Enercon
Enercon GmbH, based in Aurich, Germany, is the fourth-largest wind turbine manufacturer in the world and has been the market leader in Germany since the mid-nineties. Enercon has production facilities in Germany , Sweden, Brazil, India, Canada, Turkey and Portugal...

 of Germany
Germany
Germany , officially the Federal Republic of Germany , is a federal parliamentary republic in Europe. The country consists of 16 states while the capital and largest city is Berlin. Germany covers an area of 357,021 km2 and has a largely temperate seasonal climate...

, who are one of the leading manufacturers of wind turbines in the world. Each turbine is 64 meters tall to the hub, the rotor blades have a diameter of 71 meters which gives the turbines an overall height from the ground to the vertical tip of a blade of 99.5 meters.

Figures on the Ofgem website show that in 2008 (a leap year) the wind farm produced 43,416 Megawatt-hours of electricity, equivalent to the average needs of 9,237 domestic households. This corresponds to a capacity factor
Capacity factor
The net capacity factor or load factor of a power plant is the ratio of the actual output of a power plant over a period of time and its potential output if it had operated at full nameplate capacity the entire time...

 of:



The wind farm will contribute £280,000 to a community fund during its 25 year life, which is directed towards energy efficiency and education projects within Burton Latimer. The fund is administered by the Kettering Borough Council
Kettering Borough Council
Kettering Borough Council is a local authority in Kettering Borough, composed of 36 local councillors and currently controlled by the Conservatives, who have controlled the Council since the 2003 local elections, where they gained control from Labour with a majority of 15. Having retained control...

. The fund has paid for solar hot water heaters at a local sheltered housing development, sun pipes at a local school, and contributed £10,000 towards energy efficient renovations of the Guide Hall. The fund is cited as a case study in two reports produced by the Renewables Advisory Board

The wind farm received a Mention in the 2008 Civic Trust Awards and was shortlisted in the MKSM Excellence Awards in 2009.

In 2008 Kettering Borough Council approved an application for a further seven turbines, submitted by Burton Wold Wind Farm Extension Limited, a Company owned by the Beaty Family.

External links