Baglihar Dam also known as Baglihar Hydroelectric Power Project, is a run-of-the-river power project on the Chenab River
Chenab River
The Chenab River چنRiver' آب) is a major river of Jammu and Kashmir and the Punjab in Pakistan. It forms in the upper Himalayas in the Lahaul and Spiti district of Himachal Pradesh, India, and flows through the Jammu region of Jammu and Kashmir into the plains of the Punjab, Pakistan...

 in the southern Doda
Doda District
Area11,691 km²Population525,000 Population density36/km2 Literacy18.5% Doda is a district of Jammu region in the state of Jammu and Kashmir, India...

 district of the Indian state of Jammu and Kashmir
Jammu and Kashmir
Jammu and Kashmir is the northernmost state of India. It is situated mostly in the Himalayan mountains. Jammu and Kashmir shares a border with the states of Himachal Pradesh and Punjab to the south and internationally with the People's Republic of China to the north and east and the...

. This project was conceived in 1992, approved in 1996 and construction began in 1999. The project is estimated to cost USD $1 billion. The first phase of the Baglihar Dam was completed in 2004. With the second phase completed, on 10 October 2008, Prime Minister Manmohan Singh
Manmohan Singh
Manmohan Singh is the 13th and current Prime Minister of India. He is the only Prime Minister since Jawaharlal Nehru to return to power after completing a full five-year term. A Sikh, he is the first non-Hindu to occupy the office. Singh is also the 7th Prime Minister belonging to the Indian...

 of India
India
India , officially the Republic of India , is a country in South Asia. It is the seventh-largest country by geographical area, the second-most populous country with over 1.2 billion people, and the most populous democracy in the world...

 dedicated the 450-MW Baglihar hydro electric power project to the nation.

Design controversy and verdict

After construction began in 1999, Pakistan
Pakistan
Pakistan , officially the Islamic Republic of Pakistan is a sovereign state in South Asia. It has a coastline along the Arabian Sea and the Gulf of Oman in the south and is bordered by Afghanistan and Iran in the west, India in the east and China in the far northeast. In the north, Tajikistan...

 claimed that design parameters of Baglihar project violated the Indus Water Treaty (full text) of 1960. The Indus Water Treaty provided India with exclusive control over three eastern rivers ,Near Beacon tunnel while granting Pakistan exclusive control to three western rivers, including Chenab River. However it contained provisions for India to establish river-run power projects with limited reservoir capacity and flow control needed for feasible power generation. Availing this provision India established several run-of-the-river projects, with Pakistan objecting to these. Also in the case of the Baglihar and Kishan-Ganga projects, Pakistan claimed that some design parameters were too lax than were needed for feasible power generation and provided India with excessive ability to accelerate, decelerate or block flow of the river, thus giving India a strategic leverage in times of political tension or war.

During 1999-2004 India and Pakistan held several rounds of talks on the design of projects, but could not reach an agreement. After failure of talks on January 18, 2005, Pakistan raised six objections to the World Bank
World Bank
The World Bank is an international financial institution that provides loans to developing countries for capital programmes.The World Bank's official goal is the reduction of poverty...

, a broker and signatory of Indus Water Treaty. In April 2005 the World Bank determined the Pakistani claim as a ‘Difference’, a classification between the less serious ‘Question’ and more serious ‘Dispute’, and in May 2005 appointed Professor Raymond Lafitte, a Swiss civil engineer, to adjudicate the difference.

Lafitte declared his final verdict on February 12, 2007, in which he upheld some minor objections of Pakistan, declaring that poundage capacity be reduced by 13.5%, height of dam structure be reduced by 1.5 meter and power intake tunnels be raised by 3 meters, thereby limiting some flow control capabilities of the earlier design. However he rejected Pakistani objections on height and gated control of spillway
Spillway
A spillway is a structure used to provide the controlled release of flows from a dam or levee into a downstream area, typically being the river that was dammed. In the UK they may be known as overflow channels. Spillways release floods so that the water does not overtop and damage or even destroy...

 declaring these conformed to engineering norms of the day. India had already offered Pakistan similar minor adjustments for it to drop its objection. The Indus Waters Treaty of 1960 divided the Indus river — into which the Chenab flows — between the two countries and bars India from interfering with the flow into Pakistan while allowing it to generate electricity. However the key issue that any dam constructed by India should be strictly run of the river was rejected. Pakistan government expressed its disappointment at the final outcome. Both parties (India and Pakistan) have already agreed that they will abide by the final verdict.

The verdict acknowledged India's right to construct 'gated spillways' under Indus water treaty 1960.The report allowed pondage
Pondage
Pondage usually refers to the comparably small water storage behind the weir of a run-of-the-river hydroelectric power plant. It is considerably less storage than the reservoirs of large dams and conventional hydroelectric stations which can store water for long periods such as a dry season or year...

of 32,580,000 cubic metres as against India's demand for 37,500,000 cubic metres. The report also recommended to reduce the height of freeboard from 4.5 m to 3.0 m.

On June 1, 2010 India and Pakistan resolved the issue relating to the initial filling of Baglihar dam in Jammu and Kashmir with the neighbouring country deciding not to raise the matter further. The decision was arrived at the talks of Permanent Indus Commissioners of the two countries who are meeting.