Akkuyu Nuclear Power Plant
Encyclopedia
The first nuclear plant of Turkey
Turkey
Turkey , known officially as the Republic of Turkey , is a Eurasian country located in Western Asia and in East Thrace in Southeastern Europe...

 is planned to be built in Akkuyu, a location within Büyükeceli
Büyükeceli
- Geography :Büyükeceli had been founded on the southern slopes of Toros Mountains at . It is near to Mediterranean coast and recent housing of the town is almost at the side side. It is a part of Gülnar district which in turn is a part of Mersin Province. It is on the Mersin Antalya highway. The...

, Mersin Province
Mersin Province
The Mersin Province is a province in southern Turkey, on the Mediterranean coast between Antalya and Adana. The provincial capital is the city of Mersin and the other major town is Tarsus, birthplace of St Paul...

. But there are serious objections to the project. The most important objection is that Büyükeceli and the surrounding coastline may lose its touristic potential after the realization of the project. Büyükeceli residents are also worried that the already low population of the town may further decrease and the town may lose its township status. The government on the other hand, prefers this site because of the low population density and low risk of earthquake
Earthquake
An earthquake is the result of a sudden release of energy in the Earth's crust that creates seismic waves. The seismicity, seismism or seismic activity of an area refers to the frequency, type and size of earthquakes experienced over a period of time...

s.
In May 2010, Russia and Turkey signed an agreement that a subsidiary of Rosatom would build, own, and operate a power plant at Akkuyu comprising four 1,200 MW VVER
VVER
The VVER, or WWER, is a series of pressurised water reactors originally developed by the Soviet Union, and now Russia, by OKB Gidropress. Power output ranges from 440 MWe to 1200 MWe with the latest Russian development of the design...

units. The reactors are expected to enter service by 2019.

Turkish Electricity Trade and Contract Corporation (TETAS) has guaranteed the purchase of 70% power generated from the first two units and 30% from the third and fourth units over a 15-year power purchase agreement. Electricity will be purchased at a price of 12.35 US cents per kWh and the remaining power will be sold in the open market by the producer.
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK