Cikampek-Palimanan Toll Road is a toll road that connects the existing Jakarta-Cikampek Toll Road
Jakarta-Cikampek Toll Road
Jakarta-Cikampek toll road opened on 1988. The road links Jakarta and cities in West Java. On 2005, the toll road connects Bandung and Jakarta via Cipularang Toll Road. The interchange to Bandung built before Kalihurip exit...

 and Palimanan-Kanci Toll Road
Palimanan-Kanci Toll Road
Palikanci, abbreviation from Palimanan-Kanci Toll Road is a toll road located in the city of Cirebon, West Java.This toll road was finished on 1998.Palikanci Toll Road was operated by PT Jasa Marga Tbk.-Route:-External links:*...

 and is part of the Trans-Java Toll Road
Trans-Java toll road
-Background:Two centuries ago , Dutch East Indies colonial government has made De Groote Postweg or Great Post Road with 1,000 kilometers length between Anyer, Banten province and Panarukan, Situbondo, East Java province...

. The total length of the Trans Java Toll Road is 653 kilometers.

The project

The project is estimated at Rp11.75 trillion ($1.3 billion) and is owned by a Joint venture company PT Lintas Marga Sedaya with portion 55 percent is owned by Plus Expressways Berhad and 45 percent is owned by PT Bhaskara Utama.

Sections

Cikampek-Palimanan Toll Road will be 116 kilometers in length and consist of several sections:
  • Section I, Cikopo-Kalijati (29.12 kilometers), Land acquisition has already finished
  • Section II, Kalijati-Subang
    Subang
    -Indonesia:*Subang, Indonesia, a city in West Java*Subang Regency, a regency of West Java*Subang, Subang, a subdistrict of Subang Regency-Malaysia:*Subang, Selangor, an affluent residential town in Selangor state...

    (9.56 kilometers), Land acquisition has already finished
  • Section III, Subang-Cikedung (31.37 kilometers), Land acquisition has already finished
  • Section IV, Cikedung-Kertajati (17.66 kilometers), Land acquisition has already finished
  • Section V, Kertajati-Sumberjaya (14.51 kilometers), Land acquisition has already finished
  • Section VI, Sumberjaya-Palimanan (13.78 kilometers), Land acquisition was 58.34 percent complete and predicted to be 100 percent complete by December 2011
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 