Railway electrification comprised a single system in geographical areas of Malaysia.

Rawang-Ipoh

The double-tracking and electrification of 179 km of the main West Coast line will enable KTMB to run trains at a maximum speed of 160 km/h between Kuala Lumpur
Kuala Lumpur
Kuala Lumpur is the capital and the second largest city in Malaysia by population. The city proper, making up an area of , has a population of 1.4 million as of 2010. Greater Kuala Lumpur, also known as the Klang Valley, is an urban agglomeration of 7.2 million...

 and Ipoh
Ipoh
Ipoh is the capital city of Perak state, Malaysia. It is approximately 200 km north of Kuala Lumpur on the North-South Expressway....

. KTMB plans to introduce a rapid intercity service between KL Sentral and Ipoh, running 16 services a day initially and ultimately 32 services a day. This project, which has been beset by problems and delays, was completed in early 2008 and when full services commence in 2010, it will cut down the journey time of KL-Ipoh to 2.5 hours. This project will also enable KTMB to extend its KTM Komuter
KTM Komuter
KTM Komuter is a commuter train service in Malaysia operated by Keretapi Tanah Melayu . It was introduced in 1995 to provide local rail services in Kuala Lumpur and the surrounding Klang Valley suburban areas. It is popular with commuters into the city, who thus avoid being caught in road traffic...

 service to Tanjung Malim
Tanjung Malim
Tanjung Malim is a town in the state of Perak, Malaysia. It is approximately north of Kuala Lumpur via the North-South Expressway. It lies on the Perak-Selangor state border, with Sungai Bernam serving as the natural divider....

. The infrastructure works component of the project was originally awarded to DRB-Hicom Berhad in 2000 for a value of RM2,579,920,005.00, while Mitsui of Japan was awarded the electrification and signalling component of the project worth RM1.9 billion supported by its principle sub-contractor, Siemens-Balfour Beatty Consortium. The contract between DRB-Hicom and the Malaysian government was signed on 2 April 2001. The original completion date for DRB-Hicom was December 2003. Four main subcontractors were appointed: Emrail Sdn Bhd for trackwork, Perspec Prime (Malaysia) Sdn Bhd for civil works, IJM Corporation Berhad for the construction of stations and UEM Construction Sdn Bhd for the construction of bridges. The project however suffered problems which caused numerous delays, resulting in the government terminating the contract with DRB-Hicom and appointing UEM Construction Sdn Bhd, a subsidiary of UEM (Malaysia) Berhad, to take over the project from 1 June 2005. At that stage, DRB-Hicom was said to have completed 88% of the work. DRB-Hicom said one of the main causes of the delays was a dispute over a variation order and losses and expenses with the government. Although there were threats of litigation, the matter was submitted for arbitration and was finally settled in May 2006 with the government paying DRB-Hicom a sum of RM425 million. The company added that it was still in negotiations with the government over issues pertaining to liquidated ascertained damages and release of the performance bond. Mitsui has also submitted a claim for compensation for being unable to carry out the electrification part of the project because of the delays to civil works with the government settling on an undisclosed sum in December 2006.

On January 17, 2008, the double tracking project between Rawang and Ipoh was officially completed, marked by an event officiated by the Transport Minister. New train sets which will service the Ipoh to Kuala Lumpur route are expected to arrive in mid 2009 and will feature five stops between the cities. Fares is expected to be in MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 30 to 40 for the complete trip. Meanwhile, KTM is considering using refurbished EMUs for the Ipoh-Kuala Lumpur rapid train service until the actual EMUs arrive. KTM is using diesel locomotives for revenue service.

The Ipoh
Ipoh
Ipoh is the capital city of Perak state, Malaysia. It is approximately 200 km north of Kuala Lumpur on the North-South Expressway....

-Kuala Lumpur
Kuala Lumpur
Kuala Lumpur is the capital and the second largest city in Malaysia by population. The city proper, making up an area of , has a population of 1.4 million as of 2010. Greater Kuala Lumpur, also known as the Klang Valley, is an urban agglomeration of 7.2 million...

 shuttle was finally launched on Dec 1 2008 running 10 trips a day. Traveling time is 3 hours one way and expected to decrease to 2.25 hours once new EMUs has been delivered.

Ipoh-Padang Besar

This project was proposed in 2002 as a continuation of the Rawang-Ipoh double-tracking and electrification project. Initially awarded to two consortium. The 329 km "Northern section" between Ipoh and Padang was to be handled by a consortium made up of the Indian Railway Construction Company (Ircon), DRB-Hicom Berhad and Emrail Sdn Bhd while the "Southern section" between Seremban and Johor Bahru was to be handled by a consortium made up of the China Railway Engineering Corporation-China Railway Telecommunications Corporation (CRET), DRB-Hicom Berhad and Hikmat Asia Sdn Bhd. However, on 21 October 2003, a letter of award was issued to a 50:50 joint venture between Gamuda Berhad
Gamuda Berhad
Gamuda Berhad is an engineering, property and infrastructure company in Malaysia.The company was incorporated on October 6, 1976 and was listed on the main board of Bursa Malaysia on 10 August 1992...

 and Malaysian Mining Corporation Berhad. The change in contractors was based on the fact that Gamuda-MMC lowered the project cost to RM14.448bil, compared with over RM44bil by the two foreign contractors. Members of the two previous consortia were invited to be sub-contractors and were given the first right of refusal but the invitation was not taken up.

On 17 December 2003, not long after taking over from Dr Mahathir Mohamad, new Prime Minister Abdullah Ahmad Badawi announced that the Malaysian government had decided to postpone the project. The government revived the project in 2007 when on March 16, Deputy Prime Minister Mohd Najib Abdul Razak announced that the Cabinet Committee on Public Transport had decided to revive the shelved Northern section double tracking project. On 21 April 2007, Transport Minister Chan Kong Choy confirmed Ircon's participation in the "revived double-tracking project" and that the company will undertake the Seremban-Gemas portion of the Seremban-Johor Baru.

On 6 June 2007, Gamuda Berhad
Gamuda Berhad
Gamuda Berhad is an engineering, property and infrastructure company in Malaysia.The company was incorporated on October 6, 1976 and was listed on the main board of Bursa Malaysia on 10 August 1992...

 announced to Bursa Malaysia
Bursa Malaysia
Bursa Malaysia is an exchange holding company approved under Section 15 of the Capital Markets and Services Act 2007. It operates a fully integrated exchange, offering the complete range of exchange-related services including trading, clearing, settlement and depository services.- History :Bursa...

 that it had received a letter from the Economic Planning Unit of the Prime Minister's Department that the Malaysian government had agreed to Gamuda-MMC's proposal to implement the "Northern" section of the project on a private financing initiative basis. It added that negotiations on the formal agreement would begin as soon as possible. Transport Minister Chan Kong Choy said work on the Northern section will begin by the end of 2007 and is expected to be completed by Jan 2013.

On December 14, 2007, Gamuda announced that it together with MMC had received a letter of acceptance dated 13 December 2007 wherein the Malaysian Government accepted the proposal by the Gamuda-MMC joint venture to carry out the Electrified Double Tracking Project from Ipoh to Padang Besar on a design and build basis for a lump sum price of RM12.485 billion. The works comprises the design and construction of the infrastructure and system works in respect of the project which is to be completed within 60 months from the commencement date. The project cost has escalated due to rise in oil prices and building materials. The group managing director, Datuk Lin Yun Ling, added that the company will undertake only 20 percent of the whole project while the rest of the construction will be out sourced to various companies around the country. The project will be implemented as a construction contract with progressive payments, instead of private finance initiative envisioned earlier. The design and build contract between the joint venture company and the government of Malaysia is formally signed on July 25, 2008.

The project will consist of two sections, a 171 km stretch from Ipoh to Butterworth
Butterworth, Penang
Butterworth is the principal town of Seberang Perai in the state of Penang in Malaysia. Named after William John Butterworth, Governor of the Straits Settlements , Butterworth was established in the mid-19th century as a landing place across the channel from the capital of Penang, George Town...

 and another 158 km stretch from Bukit Mertajam
Bukit Mertajam
Bukit Mertajam is the capital of Central Seberang Perai, Penang, Malaysia. It is commonly known as BM among its locals. It is located nearby Kulim, Kedah.-About:...

 to Padang Besar. It is expected that the Ipoh-Butterworth section will given a higher priority as it is a continuation from the Rawang stretch, and will eventually shorten the travel time between Kuala Lumpur to Butterworth to three hours. The project will also feature a 3.3 km tunnel in Perak
Perak
Perak , one of the 13 states of Malaysia, is the second largest state in the Peninsular Malaysia bordering Kedah and Yala Province of Thailand to the north, Penang to the northwest, Kelantan and Pahang to the east, Selangor the Strait of Malacca to the south and west.Perak means silver in Malay...

, which will become the longest rail tunnel in South East Asia.

The government has announced on January 18, 2008 that site possession has been given to Gamuda MMC on January 8, 2008. Work on the site is expected to start immediately thereafter and completed by 2013. It is also noted that the tracks will have the design speed of 160 to 180 km/h although the operator is expect to use only 140 to 160 km/h

On July 8, 2008, The joint venture company has announced that electrification and power supply contract has been awarded to Balfour Beatty
Balfour Beatty
Balfour Beatty plc is a British construction, engineering, military housing, rail and investment services company. It is one of the largest construction companies in the UK, and the 15th largest in the world...

 group with a contract value of GBP 160 million. Work is expected to start immediately and complete by January 2013. On the same day, the signaling and communication package has been awarded to Ansaldo STS
Ansaldo STS
Ansaldo STS S.p.A. is a multinational technology company which produces signalling and automation systems for use by rail and rapid transit operators. The firm also acts as lead contractor and turnkey provider on new rail developments...

. The contract is expected to worth Euro
Euro
The euro is the official currency of the eurozone: 17 of the 27 member states of the European Union. It is also the currency used by the Institutions of the European Union. The eurozone consists of Austria, Belgium, Cyprus, Estonia, Finland, France, Germany, Greece, Ireland, Italy, Luxembourg,...

 135 million.

In September 2008, it is reported that the section from Butterworth
Butterworth, Penang
Butterworth is the principal town of Seberang Perai in the state of Penang in Malaysia. Named after William John Butterworth, Governor of the Straits Settlements , Butterworth was established in the mid-19th century as a landing place across the channel from the capital of Penang, George Town...

 to Padang Besar may not be electrified as some studies shows that the portion will mostly used for cargo. This move will save the government a few hundred million ringgit.

On March 2009, the project reached the 20% milestone and three months later, it completed 25% overall. According to the developer, the project is on schedule with expected completion by January 2013.

On December 2009, Gamuda, one of the main contractors of the project has announced that the government have extended the deadline to complete the project by 11 months to December 2013. This is due to late approval of the design and late hand over of lands from the authorities.

Seremban-Gemas

On January 7, 2008, the government of Malaysia announced that the Indian company, IRCON International
IRCON International
Ircon International Limited is an engineering and construction company, specializing in transport infrastructure. The company was established in 1976, by the Government of India under the The Companies Act, 1956. Ircon was registered as the Indian Railway Construction Company Limited, a wholly...

 won the USD1 billion (MYR 3.45 billion) contract to build a double track from Seremban
Seremban
Seremban is the capital of the Malaysian state of Negeri Sembilan, located within the district of Seremban, one of the seven districts of Negeri Sembilan. The town's administration is run by the Seremban Municipal Council or Majlis Perbandaran Seremban...

 to Gemas
Gemas
Gemas is a small town in Negeri Sembilan, Malaysia, just near the Negeri Sembilan-Johor state border. The town is located approximately 165 km from the Malaysian capital Kuala Lumpur. It is the meeting place of Malaysian west and east coast rail lines operated by Malayan Railways. For this...

. The 100 km Seremban- Sungei Gadut double tracking project is scheduled to be completed by 2010 and to Gemas by 2012. The track involves 64.85 km stretch in Negeri Sembilan
Negeri Sembilan
Negeri Sembilan, one of the 13 states that constitutes Malaysia, lies on the western coast of Peninsular Malaysia, just south of Kuala Lumpur and borders Selangor on the north, Pahang in the east, and Malacca and Johor to the south....

, 27.84 km in Melaka and 1.45 km in Johor
Johor
Johor is a Malaysian state, located in the southern portion of Peninsular Malaysia. It is one of the most developed states in Malaysia. The state capital city and royal city of Johor is Johor Bahru, formerly known as Tanjung Puteri...

. A 1.8 km tunnel and 9 bridges will be built in the process

On May 23, 2008, a joint venture between IJM
IJM Corporation Berhad
IJM Corporation Berhad is a company in Malaysia. The name IJM is derived from the name of three different companies. "I" stands for IGB Construction Sdn Bhd, "J" stands for Jurutama Sdn Bhd, and "M" stands for Mudajaya Construction Sdn Bhd. These three companies were merged to form IJM...

 and Norwest
Norwest
Norwest Corporation was a banking and financial services company based in Minneapolis, Minnesota, United States. In 1998, it merged with Wells Fargo & Co. and since that time has traded under the Wells Fargo name.-Early formation:...

 won a MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 490.12 million contract from IRCON to construct, commission and maintain infrastructure works for the electrified double-track project. The construction period is 21 months.

On May 27, 2008, a joint venture between Loh & Loh Corporation Bhd and Pasti Abadi Sdn Bhd won a MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 RM273.01 million contract to construct, commission and maintain infrastructure works. The contract include site clearance, demolition and relocation works.

On January 26, 2010, Chief Minister
Chief Minister
A Chief Minister is the elected head of government of a sub-national state, provinces of Sri Lanka, Pakistan, notably a state of India, a territory of Australia or a British Overseas Territory that has attained self-government...

 of the state of Malacca
Malacca
Malacca , dubbed The Historic State or Negeri Bersejarah among locals) is the third smallest Malaysian state, after Perlis and Penang. It is located in the southern region of the Malay Peninsula, on the Straits of Malacca. It borders Negeri Sembilan to the north and the state of Johor to the south...

, Datuk Seri Mohd Ali Rustam
Mohd Ali Rustam
Datuk Seri Haji Mohd Ali bin Mohd Rustam is a Malaysian politician. He is a member of the United Malays National Organisation and is the current Chief Minister of the state of Malacca.-Biography:...

 said the work on the dual-track railway was 32.81% completed and it was expected to be operational by Aug 2012. Once completed, the travel time between Malacca
Malacca
Malacca , dubbed The Historic State or Negeri Bersejarah among locals) is the third smallest Malaysian state, after Perlis and Penang. It is located in the southern region of the Malay Peninsula, on the Straits of Malacca. It borders Negeri Sembilan to the north and the state of Johor to the south...

 and Negri Sembilan will be shortened and new six-coach trains capable of carrying 350 passengers at 140 km per hour will be used.

Gemas-Johor Bharu

The MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 8 billion contract is expected to be tendered out by end 2008 pending a mid-term review of Ninth Malaysia Plan
Ninth Malaysia Plan
Ninth Malaysian Plan abbreviated as '9MP', is a comprehensive blueprint prepared by the Economic Planning Unit of the Prime Minister's Department and the Finance Ministry of Malaysia with approval by the Cabinet of Malaysia to allocate the national budget from the year 2006 to 2010 to all...

. The project includes building over 200 km of parallel railway tracks, including stations, depots, halts, yards and bridges and cover systems such as electrification, signaling and communications.
This include realignment between Pulau Sebang, Melaka to Gemas section.

On May 2009, Global Rail Sdn Bhd, a relatively small contractor and its Chinese partner, China Infraglobe submitted a proposal to the Government to build and upgrade tracks from Gemas
Gemas
Gemas is a small town in Negeri Sembilan, Malaysia, just near the Negeri Sembilan-Johor state border. The town is located approximately 165 km from the Malaysian capital Kuala Lumpur. It is the meeting place of Malaysian west and east coast rail lines operated by Malayan Railways. For this...

 to Johor Baharu at a cost of MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 5 billion. According to them, the project will be on a Private Finance Initiative basis and the plan submitted to the Finance Ministry later in June 2009 was conditional upon signing over mineral rights in Johor State.

On January 29, 2011, Transport Minister Datuk Seri Kong Cho Ha
Kong Cho Ha
Dato' Seri Kong Cho Ha is a Malaysian politician and is currently the Minister for Transport in the Barisan Nasional coalition government of Najib Tun Razak and the Member of the Parliament of Malaysia for the Lumut constituency in Perak. He is a member of the Malaysian Chinese Association .Kong...

 said that The Gemas-Johor Bharu double-tracking and electrification project is expected to start this year. He added that the Government hoped to appoint the contractor for the project this year and Malaysia is still in the midst of talking with China Railway Construction, but nothing is confirmed yet. Kong said two consultants had been appointed, a design consultant and an independent checker, to monitor the project. The construction of the 197 km of tracks, at an estimated cost between MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 6 billion and MYR
Myr
The symbol myr was formerly used in English-language geology, and remains as the standard usage in astronomy, as a unit of one million years.It is an abbreviation for 'million years' and lower case is used in geology, while upper case is used in astronomy....

 7 billion, would take three years.

Sentul-Port Klang extension to Batu Caves

The 7.2 km extension to the Batu Caves branch line started at the end of 2006. The project - which will cost RM515mil - will include electrification, double-tracking and refitting the existing old track, signalling, communications, as well as construction of new stations at Sentul
Sentul Komuter station
The Sentul Komuter station is a Malaysian commuter train station formerly known as Sentul railway station and is located in the east side of and named after Sentul, Kuala Lumpur. The station forms part of Sentul-Port Klang KTM Komuter train services, and is the northern terminus of the service...

, Batu Kentonmen (English: Batu Cantonment), Kampung Batu (English: Batu Village), Taman Wahyu and Batu Caves
Batu Caves
Batu Caves , is a limestone hill, which has a series of caves and cave temples, located in Gombak district, north of Kuala Lumpur, Malaysia. It takes its name from the Sungai Batu or Batu River, which flows past the hill. Batu Caves is also the name of the nearby village.The cave is one of the...

. Sentul is currently the terminus for KTM Komuter
KTM Komuter
KTM Komuter is a commuter train service in Malaysia operated by Keretapi Tanah Melayu . It was introduced in 1995 to provide local rail services in Kuala Lumpur and the surrounding Klang Valley suburban areas. It is popular with commuters into the city, who thus avoid being caught in road traffic...

's Sentul-Port Klang Line and the extension will enable the commuter train service to be extended to Batu Caves. Proposed during the 1990s, the project was initially given to DRB-Hicom Berhad and a letter of intent was issued by the Transport Ministry to the company on 13 April 2001. No letter of award was however issued and there was no movement until 2006 when site possession was given to contractor YTL Corporation Berhad on November 17, 2006. The project was completed on August 2010. The Sentul station is part of the Sentul Raya masterplan development under YTL Corporation Berhad.