Maidenhead railway station
Encyclopedia
Maidenhead railway station serves the town of Maidenhead
Maidenhead
Maidenhead is a town and unparished area within the Royal Borough of Windsor and Maidenhead, in Berkshire, England. It lies on the River Thames and is situated west of Charing Cross in London.-History:...

, Berkshire
Berkshire
Berkshire is a historic county in the South of England. It is also often referred to as the Royal County of Berkshire because of the presence of the royal residence of Windsor Castle in the county; this usage, which dates to the 19th century at least, was recognised by the Queen in 1957, and...

, England
England
England is a country that is part of the United Kingdom. It shares land borders with Scotland to the north and Wales to the west; the Irish Sea is to the north west, the Celtic Sea to the south west, with the North Sea to the east and the English Channel to the south separating it from continental...

. It is served by local services operated by First Great Western
First Great Western
First Great Western is the operating name of First Greater Western Ltd, a British train operating company owned by FirstGroup that serves Greater London, the South East, South West and West Midlands regions of England, and South Wales....

 from to , and is also the junction for the Marlow Branch Line
Marlow Branch Line
The Marlow Branch Line is a single track railway line between Maidenhead, Berkshire, Bourne End and Marlow, Buckinghamshire, England. Passenger services are operated by First Great Western using Class 165 diesel trains...

. It has five platforms which are accessed through ticket barriers at both entrances to the station. The Marlow line platform has an overall roof. The ticket barriers also stop the station being used as a walk through route.

History

The station is on the original line of the Great Western Railway
Great Western Railway
The Great Western Railway was a British railway company that linked London with the south-west and west of England and most of Wales. It was founded in 1833, received its enabling Act of Parliament in 1835 and ran its first trains in 1838...

, which opened as far as Reading in 1840. The original Maidenhead Station lay east of the Thames, not far from the present station. This was the line's first terminus, pending the completion of the Sounding Arch (Maidenhead Railway Bridge
Maidenhead Railway Bridge
Maidenhead Railway Bridge is a railway bridge carrying the main line of the Great Western Railway over the River Thames between Maidenhead, Berkshire and Taplow, Buckinghamshire, England...

) bridge over the river. In 1854, the Wycombe Railway Company
Wycombe Railway
The Wycombe Railway was a British railway between and that connected with the Great Western Railway at both ends; there was one branch, to .-History:The Wycombe Railway Company was incorporated by an act of Parliament passed in 1846...

 built a line from Wycombe
High Wycombe railway station
High Wycombe railway station is situated in High Wycombe in South Buckinghamshire. The station is served by Chiltern Railways trains on the Chiltern Main Line from Marylebone towards Birmingham Snow Hill. It is situated between Beaconsfield and Saunderton stations.-History:The station was built...

 to Maidenhead, with a station on Castle Hill, at first called "Maidenhead (Wycombe Branch)", later renamed "". However, there was no station on the present site until 1871, when local contractor William Woodbridge built it. Originally, it was called "Maidenhead Junction", but eventually it came to replace the Boyn Hill station as well as the original station on the Maidenhead Riverside.

In 2008 the station underwent major renovation works.

Services

As well as regular services to London Paddington, trains run to Reading, Oxford and Marlow.

Crossrail

Maidenhead is the planned western terminus of Crossrail
Crossrail
Crossrail is a project to build a major new railway link under central London. The name refers to the first of two routes which are the responsibility of Crossrail Ltd. It is based on an entirely new east-west tunnel with a central section from to Liverpool Street station...

Line 1. The station will undergo significant modification, including the replacement of the existing passenger waiting facilities, a new ticket hall, lifts, a new platform for Marlow branch line services, the introduction of overhead line equipment and the construction of new stabling and turnback facilities to the west of the station. There is, however, a strong local campaign to extend Crossrail to a terminus at .
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK