The Lucknow Metro is a proposed rapid transit system in the Indian city of Lucknow
Lucknow
Lucknow is the capital city of Uttar Pradesh in India. Lucknow is the administrative headquarters of Lucknow District and Lucknow Division....

that has to be built and is operated by the Lucknow Metro Rail Corporation Limited (LMRC). The proposed and passed metro rail track consitutes of two lines, one from Amausi to Munshi Pulia & the other from Vasant kunj to Charbagh Railway Station, both the lines intersecting at Charbagh. An extension line from Indira Nagar Polytechnic Crossing will extend it to Patrakarpuram in Gomti Nagar. The difference between arrival time of trains at each station is expected to be 7 minutes (The time to be reduced to 5 minutes and then to 3 minutes in phases).

Corridors & Routes

The Lucknow metro rail project includes three corridors: North-South, East-West and the Gomti Nagar link. The estimated construction cost would be Rs 7,413 crore for North-South corridor, Rs 4,611 crore for East-West corridor and Rs 495 crore for Gomti Nagar link.

North South Corridor

The North-South corridor will connect Amausi airport to Munshipulia and cover a distance of 23 km, including 14.87 km elevated, 1km ramp and 7.2 km underground. This corridor will have a total 21 stations including 15 overhead and six underground.
The elevated stations will include Airport terminal, Amausi, Transport Nagar, Krishna Nagar, Shringar Nagar, Alambagh, Alambagh ISBT. This shall be followed by an undergroung section that will include Durgapuri, Lucknow Railway Station (Charbagh), Hussainganj, Sachiwalay (Uttar Pradesh Secretariat), Hazratganj, KD Singh Babu Stadium. Here after, the track will be elevated again, stations in the sequence are Lucknow University, IT College, Mahanagar, Badshahnagar, Lekhraj Market, Ram Sagar Mishra Colony, Indira Nagar and a termination station Munshi Pulia.

Gomti Nagar Link

The Train coming from Airport Terminal will be diverted towards Gomti Nagar at the Indira Nagar Trisection [Polytechnic Crossing]. The stations in this route are Indira Nagar Trisection, West End Mall [Waves Multiplex], Gomti Nagar & Patrakarpuram. This overall section will be elevated.

East-West Corridor

The East-West corridor will connect Lucknow railway station at Charbagh to Vasantkunj on Hardoi Road and have a total length of 11 km, including 4.29 km elevated, 0.5 km ramp and 6.3 km underground. This corridor will have a total of 12 stations including seven underground and five overhead. The stations below groung level in this chain will be Lucknow Railway Station (Charbagh), Gautam Buddha Marg, Aminabad, Pandeyganj, Lucknow City Railway Station, Chattrapati Shahuji Maharaj Medical University (King George Medical University) & Niwazganj.
This shall be followed by elevated section that will include the stations at Thakurganj, Balaganj, Sarfarazganj, MoosaBagh and the Vasant Kunj Terminal.

The designed speed of metro would be 80 km/hr while the scheduled speed would be 34 km/ hr for North-South corridor and 32 km/hr for East-West corridor. There would be only one depot at Vasant Kunj spread over a land measuring 20 hectares. The Amausi Depot has been done away because of its promiximity to the Airport and the subsequent reasons of security and safety.

Status

Collection of soil samples begin on 5 August 2009.
soil collection work completed in September.Report says soil condition feasible for metro rail
Lucknow Metro Rail gets a blueprint from Delhi Metro Rail Corporation.

The Draft Detailed Project Report has been submitted to LDA by DMRC & SREI. There are certain issues on integration of the Airport with the metro line. Government has to take a call on the type of station they want at the airport. In brief, there are 21 stations proposed on the North-South corridor (Airport to Munshi Pulia) out of 21, 6 stations are underground. Number of stations proposed on the East-West corridor are 12 out of which 7 stations are underground. Both the corridors will integrate at the Lucknow Railway Station at Charbagh & the stations on both lines will be underground. After the high level meeting with Chief Secretary and Divisional Commissioner, it was decided to take the metro line to Gomti Nagar. So a 3.5 km of line has been proposed from Indira Nagar Polytechnic Trisection Station on the North-South corridor towards Patrakarpuram in Gomti Nagar. There will be three elevated stations in this route.