Concrete
Posts  1 - 1  of  1
m3karim
What is the average manhour ( direct and indirect) per one m3 of reiforced concrete for footing,column neck, ground beam,column,beams and slab. i.e normal and typicl structure?.
then what the average percentage for each dir.& indir. from the total manhours?
tanks.
Save
Cancel
Reply
 
x
OK