We are using A672 C65 CL32 Pipe Nace + HIC for sour flare with (H2S>500PPM)up to 68" size. We want to extend the same piping material for 106" line. The design pr. is 3.5kg/cm2 + half vacuum,design temp. range 180 to 300 degree C. Corresion allowance is 3mm. Please advise whether we can extend the present specification upto 106".
Save
Cancel
Reply
replied to:  vka2053
sadegh
Replied to:  We are using A672 C65 CL32 Pipe Nace + HIC for...
It seems this point don't have any point if you use a106 with all requirement point of Nace standard+hic requirement but you shall use seamless pipe and supply of a106 seemless is very difficalt.